USS Shackleton Internal Comms Thread

BH1Pd8X.png
Stardate 96566.8
Security Level 1 - Open

TO CMDR T. Akaela
CC
FROM CAPT A. Derenzis
SUBJ The Brahe Incident
fioOIzQ.png

Commander Akaela,

After I formally resume command tomorrow morning, I want to speak with you in my ready room about your recent report to Starfleet.

//SIGNED//
CAPT Alyx J. Derenzis,
Commanding Officer / U.S.S. Shackleton
3 Likes
BH1Pd8X.png
Stardate 96587.9
Security Level 1 - Open

TO <Shackleton/Engineering>
CC CAPT A. Derenzis, CMDR T. Akaela, <DS13/Engineering>
FROM LCDR Voyrays
SUBJ Shackleton Refit Schedule
fioOIzQ.png

Everyone:

Our refit operations begin this week; we have much to do in the coming month. Upgrades to the Warp Drive, Shield Systems, Phaser Arrays, Sensor Arrays, and Tractor Beam systems must all be completed and tested in this timeframe. This communication will assign team leads for each section and an expected schedule for when tasks should begin and finish. H'ajah-Commander, I hope we can count on DS13's staff to supplement our own for a swift and efficient refit; feel free to assign team leads as you see fit to work alongside ours.

The Warp Drive upgrades will be attempted in three stages. First will be replacing the GE Mk X-8b Warp Core with a Yoyodyne 45A M/ARC Warp Core; I expect this to be completed by Stardate 96607.1. Llohsa-Lieutenant, you will oversee the replacement operation. Second will be the swapping of all Warp Coils in both nacelles, which will occur at the same time as the warp core replacement. th'Terias-Lieutenant, you will be in charge of the warp coil replacement operation. Finally, once both of these operations are complete, the warp plasma conduits linking the core to the coils will be upgraded to allow increased plasma flow to the nacelles. Everton-Lieutenant, you will oversee this operation. Completion of all steps should be done by Stardate 96629.1, and static tests by Stardate 96637.3. We expect these upgrades will allow us to generate warp fields up to 1,900 Cochranes (up from the existing limit of 1,450 Cochranes), and increase our maximum cruising speed from Warp 9.5 to Warp 9.65. I do not anticipate any changes to our standard cruising speed or our maximum warp speed, although these improvements will allow us to sustain higher warp speeds for longer.

Once the Warp core is installed, EPS conduits leading to the Phaser Arrays, Shield Generator and Tractor Beam will need to be upgraded to facilitate the planned upgrades in those sections. Khet-Lieutenant, you will oversee this task. Have all stated conduits upgraded by Stardate 96628.0, please.

Once the EPS conduits have been upgraded, we will replace the Mk XIII phaser emitters in all eight arrays with MK XIV emitters. Senak-Lieutenant, work with zh'Cholal-Commander on the phaser upgrades and tests. The damage to the ventral phaser array will add to the time needed; but I expect a suitable finishing time to be Stardate 96642.8. We will also attempt Shield and Tractor Beam upgrades within this timeframe. Valerian-Lieutenant, you will be in charge of the shield upgrade, while Laureline-Lieutenant will be in charge of tractor beam upgrades.

Finally, the Lateral Sensor Arrays are to be expanded. We will be replacing the 8 DYN-90 Sensor Suites with 16 DYN-115 Sensor Suites. These suites are smaller than the DYN-90s, but will allow for greater resolution for long-range imaging. We will also replace the sensor pallets for these suites at the same time. The upgrade will begin on Stardate 96645.5 and finish by Stardate 96659.2. Pollack-Lieutenant will be in charge of the sensor upgrades.

Since phaser, shield, tractor beam and sensor upgrades will take place during the standard Fleet Summer Leave Rotation, teams assigned may consider themselves on leave as of now, and return to duty by Stardate 96631.1. All other teams should find their leave time unchanged from the standard rotation.

May your children see the Springtime,

//SIGNED//
LCDR Voyrays
Chief Engineer / U.S.S. Shackleton
5 Likes
BH1Pd8X.png
Stardate 96623
Security Level 1 - Open

zpglS1t.png
TO LCDR Voyrays
FROM LT Khet, Mossic
SUBJ Re: Shackleton Refit Schedule
4OB3P0J.png

Voyrays-Commander, the EPS upgrades are complete.

I just want to say it's been a pleasure working with you, and I really appreciate all you've taught me over the past year. I'm grateful for the opportunity to serve on the Shackleton and hope I'll be back someday.

May your children see springtime,

//SIGNED//
Lt. Mossic Khet
Engineering, U.S.S. Shackleton
3 Likes