SUBMITTED: Stardate 95029.5 | FILED BY: CMDR T'irin of Vulcan | SECURITY: Level 1 - Open |
LOCATION: Deep Space Thirteen
MISSION: Route Command and Control Systems for Tactical, Main Operations, and Auxillary Operations.
OUTCOME: Clean up and repairs were done to the areas of Tactical, Main Operations and Auxillary Operations were completed before the systems were routed and ready to become fully operational.
KEY PERSONNEL:
LCDR Elizabeth Kermit
CMDR Josh Everett
CMDR T'irin of Vulcan
NARRATIVE: Connections were re-established between the aforementioned sections and power was restored. The areas are ready for permanent use.
RECOMMENDATION: Maintain observation in engineering over power connections between the areas.
OOC: This was part of Project DS13 headed by Kermit.